Evidence Zero
Protection Statement 8 (v2)
Structured document preview (seed-rendered, same surface as the application report)
Protection philosophy and grading summary
| Application reference | TAC-2026-0010 |
|---|---|
| Project | Adalbertofield Solar Scheme |
| Developer / client | Kilback - Veum SPV Ltd |
| Parent developer | Hudson, Feeney and Ernser |
| Document (as filed) | Protection Statement 8 (v2) |
| Inferred type | protection statement |
| Category | technical |
| Document date | 2026-08-04T07:35:55.000Z |
This controlled extract supports TAC-2026-0010 for Adalbertofield Solar Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 73 MW (export). Technology: solar_plus_bess. Interface: Terrencefort BSP · 132 kV class interface.
| Drawing / doc no. | TAC-2026-0010-TEC-PROTECTION-01 |
|---|---|
| Revision | C — issued for connection review |
| Author | Authorised technical representative |
Key parameters (representative)
- Primary plant ratings and protection zones cross-referenced to relay setting files in the confidential appendix.
- Selectivity between incomer, transformer HV, and feeder protection maintained for minimum fault contributions.
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 6) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Relay functions, grading references, and interface protection files are identified in the protection extract.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-6 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-6 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-6 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-6 | Critical path through reinforcement, primary plant, and commissioning tests. |
Fault-level results are marked pending and no equipment-rating mitigation is defined.
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 7) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Harmonic compliance is referenced, but source model assumptions are provisional.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-7 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-7 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-7 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-7 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 8) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-8 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-8 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-8 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-8 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 9) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-9 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-9 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-9 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-9 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 10) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-10 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-10 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-10 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-10 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 11) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-11 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-11 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-11 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-11 | Critical path through reinforcement, primary plant, and commissioning tests. |
Protection Statement 8 (v2) — supporting appendix
This appendix (sheet 12) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-12 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-12 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-12 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-12 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Protection Statement 8 (v2) · p.6
Relay functions, grading references, and interface protection files are identified in the protection extract.
[2] Protection Statement 8 (v2) · p.6
Fault-level results are marked pending and no equipment-rating mitigation is defined.
[3] Protection Statement 8 (v2) · p.7
Harmonic compliance is referenced, but source model assumptions are provisional.