GridLayer Operator View
UK DNO 1

Engineer Review Queue

Gate 2 Tranche — Large Generation Export. The table below lists real applications from the API whose workflow is in engineer review with no final engineer decision yet. Approvals update the same application documents used across tranches, document review, and reports.

Loaded from applications collection
Submitted
10
in pipeline
Returned
1
awaiting developer fix
Ready for Tranche
3
screening or in review
Clean Approvals
3
passed without flags
Conditional
3
approval with conditions
Deferred / Escalated
1
blocked or escalated

Applications awaiting engineer review

1 in queue · 10 total in pipeline
ProjectExport MWConnection NodeReadinessTranche ResultKey IssueSame app elsewhere
Port Gabriella Storage Scheme
TAC-2026-0005
35 MWWolftown BSPReady with flagsApprove
Showing 1 awaiting review (10 applications loaded)
1

Recent engineer decisions

Applications with a recorded finalDecision (from this queue or elsewhere). Each row links to the same application in Audit log and Application report.

Last 20 by decision time
ProjectDecisionWorkflow stageDecidedOpen
Cicero Wind Scheme
TAC-2026-0007
approvefinalised06 May 2026, 17:42