Evidence Zero
Export Capacity Schedule 7 (v4)
Structured document preview (seed-rendered, same surface as the application report)
Export capacity schedule — operating envelopes
| Application reference | TAC-2026-0010 |
|---|---|
| Project | Adalbertofield Solar Scheme |
| Developer / client | Kilback - Veum SPV Ltd |
| Parent developer | Hudson, Feeney and Ernser |
| Document (as filed) | Export Capacity Schedule 7 (v4) |
| Inferred type | export capacity schedule |
| Category | technical |
| Document date | 2026-08-04T07:35:55.000Z |
This controlled extract supports TAC-2026-0010 for Adalbertofield Solar Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 73 MW (export). Technology: solar_plus_bess. Interface: Terrencefort BSP · 132 kV class interface.
| Drawing / doc no. | TAC-2026-0010-TEC-EXPORT-01 |
|---|---|
| Revision | C — issued for connection review |
| Author | Authorised technical representative |
Key parameters (representative)
- Firm export capability stated net of auxiliary load; curtailment assumptions per annual yield model v4.
- Ramp rate limits under grid code ride-through tables attached to the full submission.
Declared export capability is 73 MW (export) and is stated net of auxiliary load.
Export Capacity Schedule 7 (v4) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.
Export Capacity Schedule 7 (v4) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Export Capacity Schedule 7 (v4) · p.1
Declared maximum export capacity: 73 MW (steady state).
[2] Export Capacity Schedule 7 (v4) · p.2
Installed plant capacity: 85 MW (sum of generators).
[3] Export Capacity Schedule 7 (v4) · p.2
Declared export capability is 73 MW (export) and is stated net of auxiliary load.
[4] Export Capacity Schedule 7 (v4) · p.3
Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.
[5] Export Capacity Schedule 7 (v4) · p.3
The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.