Evidence Zero

Export Capacity Schedule 7 (v4)

Structured document preview (seed-rendered, same surface as the application report)

Export capacity schedule — operating envelopes

Application referenceTAC-2026-0010
ProjectAdalbertofield Solar Scheme
Developer / clientKilback - Veum SPV Ltd
Parent developerHudson, Feeney and Ernser
Document (as filed)Export Capacity Schedule 7 (v4)
Inferred typeexport capacity schedule
Categorytechnical
Document date2026-08-04T07:35:55.000Z

This controlled extract supports TAC-2026-0010 for Adalbertofield Solar Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 73 MW (export). Technology: solar_plus_bess. Interface: Terrencefort BSP · 132 kV class interface.

Drawing / doc no.TAC-2026-0010-TEC-EXPORT-01
RevisionC — issued for connection review
AuthorAuthorised technical representative

Key parameters (representative)

- Firm export capability stated net of auxiliary load; curtailment assumptions per annual yield model v4.

- Ramp rate limits under grid code ride-through tables attached to the full submission.

Declared export capability is 73 MW (export) and is stated net of auxiliary load.

Export Capacity Schedule 7 (v4) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.

Export Capacity Schedule 7 (v4) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Export Capacity Schedule 7 (v4) · p.1

    Declared maximum export capacity: 73 MW (steady state).

  • [2] Export Capacity Schedule 7 (v4) · p.2

    Declared export capability is 73 MW (export) and is stated net of auxiliary load.

  • [3] Export Capacity Schedule 7 (v4) · p.3

    Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.

  • [4] Export Capacity Schedule 7 (v4) · p.3

    The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.