Evidence Zero
Ownership Evidence 3 (v2)
Structured document preview (seed-rendered, same surface as the application report)
Ownership evidence pack — title and control summary
| Application reference | TAC-2026-0010 |
|---|---|
| Project | Adalbertofield Solar Scheme |
| Developer / client | Kilback - Veum SPV Ltd |
| Parent developer | Hudson, Feeney and Ernser |
| Document (as filed) | Ownership Evidence 3 (v2) |
| Inferred type | ownership evidence |
| Category | land rights |
| Document date | 2026-08-04T07:35:55.000Z |
This pack summarises title and control evidence for the land associated with Adalbertofield Solar Scheme (TAC-2026-0010). It supports assertions that the project has sufficient rights over the development footprint and access routes.
| Parcel / title | Interest type | Notes |
|---|---|---|
| TITLE-A | Option / leasehold | Primary development footprint (1130 acres). |
| TITLE-B | Easement route | Cable corridor and access rights. |
| TITLE-C | Wayleave | Temporary construction access and utility crossing. |
Solicitor commentary (extract)
Based on reviewed registers and plan extracts, no adverse entries materially preventing development have been identified, subject to standard assumptions and outstanding searches listed in the legal schedule.
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
OS-1 and OS-3 certificates are listed for West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer with registered proprietors aligned to Kilback - Veum SPV Ltd.
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Title extracts show unencumbered ownership subject only to standard utility easements.
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 6) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-6 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-6 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-6 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-6 | Critical path through reinforcement, primary plant, and commissioning tests. |
The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 7) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-7 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-7 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-7 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-7 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 8) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-8 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-8 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-8 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-8 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 9) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-9 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-9 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-9 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-9 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 10) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-10 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-10 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-10 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-10 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 3 (v2) — supporting appendix
This appendix (sheet 11) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-11 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-11 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-11 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-11 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Ownership Evidence 3 (v2) · p.6
The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.
[2] Ownership Evidence 3 (v2) · p.5
Title extracts show unencumbered ownership subject only to standard utility easements.
[3] Ownership Evidence 3 (v2) · p.3
OS-1 and OS-3 certificates are listed for the land interests described in the application schedules with registered proprietors aligned to Kilback - Veum SPV Ltd.