GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0010

Reviewing documents for Adalbertofield Solar Scheme

Bundle references

1 / 1

Evidence Zero

Red Line Boundary Plan 2

Structured document preview (seed-rendered, same surface as the application report)

Red-line boundary plan — controlled extract

Application referenceTAC-2026-0010
ProjectAdalbertofield Solar Scheme
Developer / clientKilback - Veum SPV Ltd
Parent developerHudson, Feeney and Ernser
Document (as filed)Red Line Boundary Plan 2
Inferred typered line boundary plan
Categoryland rights
Document date2026-08-04T07:35:55.000Z

This extract identifies the proposed development boundary for Adalbertofield Solar Scheme (TAC-2026-0010) at West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer. The red-line extent is recorded as 1130 acres and should be read alongside title and access plans in the land bundle.

Plan elementCodeDescription
Development extentRL-01Primary generation and ancillary infrastructure boundary (edged red).
Access corridorRL-02Construction and operational access route to public highway.
Cable route optionRL-03Indicative export cable alignment to connection interface.
Exclusion zoneRL-04Sensitive habitat and offset zone excluded from permanent works.

Coordinate and annotation references

Coordinate geometry and parcel overlays are maintained in the GIS source package. This PDF extract is a controlled representation for review and traceability; engineering set-out must use the survey-grade source files.

The red-line plan identifies the development extent, access corridor, cable route option, and exclusion zones for West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer.

Boundary checks for readiness review

- Confirm red-line area is consistent with land option/lease acreage assumptions.

- Verify access and easement corridors are represented in ownership evidence.

- Confirm planning submission plans and technical layout plans reference the same boundary revision.

Red Line Boundary Plan 2 — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The plan marks an access track but does not identify affected third-party rights, public rights of way, or wayleave counterparties.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Red Line Boundary Plan 2 — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The access corridor is shown as RL-02, but the easement owner and wayleave instrument are not named on the plan.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Red Line Boundary Plan 2 · p.1

    Red line boundary encloses 121 acres for the proposed installation.

  • [2] Red Line Boundary Plan 2 · p.4

    The access corridor is shown as RL-02, but the easement owner and wayleave instrument are not named on the plan.

  • [3] Red Line Boundary Plan 2 · p.2

    The red-line plan identifies the development extent, access corridor, cable route option, and exclusion zones for the land interests described in the application schedules.

  • [4] Red Line Boundary Plan 2 · p.3

    The plan marks an access track but does not identify affected third-party rights, public rights of way, or wayleave counterparties.