GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0010

Reviewing documents for Adalbertofield Solar Scheme

Bundle references

1 / 1

Evidence Zero

Insurance Certificate 1 (v2)

Structured document preview (seed-rendered, same surface as the application report)

Certificate of insurance — construction phase

Application referenceTAC-2026-0010
ProjectAdalbertofield Solar Scheme
Developer / clientKilback - Veum SPV Ltd
Parent developerHudson, Feeney and Ernser
Document (as filed)Insurance Certificate 1 (v2)
Inferred typeinsurance certificate
Categoryinsurance
Document date2026-08-04T07:35:55.000Z

This certificate evidences policies in force for works relating to Adalbertofield Solar Scheme (TAC-2026-0010) at West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer. Limits and deductibles are stated below and are subject to the full policy wordings.

InsuredKilback - Veum SPV Ltd
BrokerCairnholm Risk Partners Ltd
CAR policy no.CAR-TAC20260-UK
Public liability limitGBP 50,000,000 any one occurrence
Employers’ liabilityGBP 10,000,000 any one claim

Endorsements and loss payees

Loss payee endorsements shall be issued in favour of Meridian Project Finance Limited and any additional parties listed in the credit agreement. Delay in start-up cover is included subject to a waiting period of ninety (90) days.

CAR policy CAR-TAC20260-UK is listed for construction works at West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer.

Operational phase rollover

Upon PAC, operational all-risks and business interruption policies will roll in with a sum insured indexed to 73 MW (export) and declared technology (solar_plus_bess).

Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.

Insurance Certificate 1 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.

Insurance Certificate 1 (v2) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Public liability is scheduled at £10,000,000 any one occurrence for Adalbertofield Solar Scheme construction and operations phases.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Insurance Certificate 1 (v2) · p.3

    Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.

  • [2] Insurance Certificate 1 (v2) · p.4

    Public liability is scheduled at £10,000,000 any one occurrence for Adalbertofield Solar Scheme construction and operations phases.

  • [3] Insurance Certificate 1 (v2) · p.2

    CAR policy CAR-TAC20260-UK is listed for construction works at the land interests described in the application schedules.

  • [4] Insurance Certificate 1 (v2) · p.3

    The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.

  • [5] Insurance Certificate 1 (v2) · p.2

    Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.