Planning application dossier — indexed submission
| Application reference | TAC-2026-0010 |
|---|---|
| Project | Adalbertofield Solar Scheme |
| Developer / client | Kilback - Veum SPV Ltd |
| Parent developer | Hudson, Feeney and Ernser |
| Document (as filed) | Planning Application 1 (v2) |
| Inferred type | planning application |
| Category | planning |
| Document date | 2026-08-04T07:35:55.000Z |
This dossier records the principal planning submission components for Adalbertofield Solar Scheme (TAC-2026-0010) submitted by Kilback - Veum SPV Ltd. It reflects the development description, supporting studies, and drawing index issued for authority determination and related operator review.
| Submission item | Doc ref | Description |
|---|---|---|
| Application form | PA-001 | Signed application form and ownership certificates. |
| Design & access statement | PA-012 | Design rationale, constraints, and access strategy. |
| Environmental statement | PA-030 | Topic chapters and non-technical summary. |
| Site plans | PA-042 | Location, red-line, and access plans in controlled revision. |
Development summary
The application seeks consent for solar_plus_bess with associated access, cabling, drainage, and temporary construction compounds at West Deondre Site: 45989 Wuckert Glen, Fort Jennyfer. The submission assumes export capability of 73 MW (export) and a grid interface at Terrencefort BSP · 132 kV class interface.
Consultation and revisions
Pre-application consultations were undertaken with planning, highways, and ecology officers. Revisions include landscape buffer adjustments, construction traffic routing updates, and phased habitat management commitments.
Schedule of principal plans
| Plan title | Revision | Purpose |
|---|---|---|
| Location plan | Rev C | Demonstrates site extent and surrounding context. |
| Red-line plan | Rev D | Defines planning boundary and access corridors. |
| Layout plan | Rev B | Indicative plant arrangement and cable corridors. |
| Construction logistics | Rev A | Temporary works, compounds, and haul routes. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 6) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-6 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-6 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-6 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-6 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 7) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
The planning register confirms validation and fee payment for the full application family.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-7 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-7 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-7 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-7 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 8) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-8 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-8 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-8 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-8 | Critical path through reinforcement, primary plant, and commissioning tests. |
The dossier records pre-application consultation with planning, highways, and ecology officers and describes design revisions.
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 9) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
The dossier explains project components but does not clearly separate need, grid benefit, and policy alignment.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-9 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-9 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-9 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-9 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 10) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-10 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-10 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-10 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-10 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 11) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-11 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-11 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-11 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-11 | Critical path through reinforcement, primary plant, and commissioning tests. |
Planning Application 1 (v2) — supporting appendix
This appendix (sheet 12) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-12 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-12 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-12 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-12 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Planning Application 1 (v2) · p.9
The dossier explains project components but does not clearly separate need, grid benefit, and policy alignment.
[2] Planning Application 1 (v2) · p.7
The planning register confirms validation and fee payment for the full application family.
[3] Planning Application 1 (v2) · p.8
The dossier records pre-application consultation with planning, highways, and ecology officers and describes design revisions.