Evidence Zero

Single Line Diagram 5 (v2)

Structured document preview (seed-rendered, same surface as the application report)

Single-line diagram — controlled schematic extract

Application referenceTAC-2026-0010
ProjectAdalbertofield Solar Scheme
Developer / clientKilback - Veum SPV Ltd
Parent developerHudson, Feeney and Ernser
Document (as filed)Single Line Diagram 5 (v2)
Inferred typesingle line diagram
Categorytechnical
Document date2026-08-04T07:35:55.000Z

This controlled extract supports TAC-2026-0010 for Adalbertofield Solar Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 73 MW (export). Technology: solar_plus_bess. Interface: Terrencefort BSP · 132 kV class interface.

The schematic extract identifies the POC, transformer, MV collection, metering, and generation/storage assets at Terrencefort BSP · 132 kV class interface.

Drawing / doc no.TAC-2026-0010-TEC-SLD-01
RevisionC — issued for connection review
AuthorAuthorised technical representative

Key parameters (representative)

- POC at grid interface with main incomer, station transformer, and MV collection to inverter / PCS islands.

- Earthing: TN-S at POC transitioning to IT for selected MV sections per design review DR-TEC-14.

Single Line Diagram 5 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Single Line Diagram 5 (v2) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Single Line Diagram 5 (v2) — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0010 for Adalbertofield Solar Scheme. It cross-references the declared export capability (73 MW (export)), the technology mix (solar_plus_bess), and the connection scope at Terrencefort BSP · 132 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

This document states 132 kV, which must be compared against planning, offer, and contractual documents.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Single Line Diagram 5 (v2) · p.1

    Connection at 132 kV bus to local DNO substation.

  • [2] Single Line Diagram 5 (v2) · p.5

    This document states 132 kV, which must be compared against planning, offer, and contractual documents.

  • [3] Single Line Diagram 5 (v2) · p.4

    Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.

  • [4] Single Line Diagram 5 (v2) · p.1

    The schematic extract identifies the POC, transformer, MV collection, metering, and generation/storage assets at Terrencefort BSP · 132 kV class interface.