Inverter / PCS — performance and grid support functions
| Application reference | TAC-2026-0005 |
|---|---|
| Project | Port Gabriella Storage Scheme |
| Developer / client | Bernier LLC SPV Ltd |
| Parent developer | Legros, Howe and Rodriguez |
| Document (as filed) | Inverter Datasheet 4 |
| Inferred type | inverter datasheet |
| Category | technical |
| Document date | 2026-06-07T11:23:08.000Z |
This controlled extract supports TAC-2026-0005 for Port Gabriella Storage Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 35 MW (export). Technology: solar_pv. Interface: Wolftown BSP · 66 kV class interface.
The datasheet identifies warranty-backed ratings, operating envelopes, and defect-liability assumptions.
| Drawing / doc no. | TAC-2026-0005-TEC-INVERTER-01 |
|---|---|
| Revision | C — issued for connection review |
| Author | Authorised technical representative |
Key parameters (representative)
- Primary plant ratings and protection zones cross-referenced to relay setting files in the confidential appendix.
- Selectivity between incomer, transformer HV, and feeder protection maintained for minimum fault contributions.
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 6) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-6 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-6 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-6 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-6 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 7) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-7 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-7 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-7 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-7 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 8) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-8 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-8 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-8 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-8 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 9) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-9 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-9 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-9 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-9 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 10) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-10 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-10 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-10 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-10 | Critical path through reinforcement, primary plant, and commissioning tests. |
Factory acceptance testing, sea freight, and site receipt windows are stated relative to contractual delivery dates.
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 11) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Reactive capability is described, but grid-forming mode is not expressly labelled.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-11 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-11 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-11 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-11 | Critical path through reinforcement, primary plant, and commissioning tests. |
Inverter Datasheet 4 — supporting appendix
This appendix (sheet 12) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-12 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-12 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-12 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-12 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Inverter Datasheet 4 · p.5
Unit complies with grid code reactive power requirements over the operating envelope.
[2] Inverter Datasheet 4 · p.10
Factory acceptance testing, sea freight, and site receipt windows are stated relative to contractual delivery dates.
[3] Inverter Datasheet 4 · p.11
Reactive capability is described, but grid-forming mode is not expressly labelled.
[4] Inverter Datasheet 4 · p.1
The datasheet identifies warranty-backed ratings, operating envelopes, and defect-liability assumptions.