GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0005

Reviewing documents for Port Gabriella Storage Scheme

Bundle references

1 / 4

Evidence Zero

Ownership Evidence 4 (v2)

Structured document preview (seed-rendered, same surface as the application report)

Ownership evidence pack — title and control summary

Application referenceTAC-2026-0005
ProjectPort Gabriella Storage Scheme
Developer / clientBernier LLC SPV Ltd
Parent developerLegros, Howe and Rodriguez
Document (as filed)Ownership Evidence 4 (v2)
Inferred typeownership evidence
Categoryland rights
Document date2026-06-07T11:23:08.000Z

This pack summarises title and control evidence for the land associated with Port Gabriella Storage Scheme (TAC-2026-0005). It supports assertions that the project has sufficient rights over the development footprint and access routes.

Parcel / titleInterest typeNotes
TITLE-AOption / leaseholdPrimary development footprint (80 acres).
TITLE-BEasement routeCable corridor and access rights.
TITLE-CWayleaveTemporary construction access and utility crossing.

OS-1 and OS-3 certificates are listed for Haltom City Site: 550 Hardy Lake, Haleyshire with registered proprietors aligned to Bernier LLC SPV Ltd.

Solicitor commentary (extract)

Based on reviewed registers and plan extracts, no adverse entries materially preventing development have been identified, subject to standard assumptions and outstanding searches listed in the legal schedule.

Ownership Evidence 4 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Ownership Evidence 4 (v2) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Ownership Evidence 4 (v2) — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Title extracts show unencumbered ownership subject only to standard utility easements.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Ownership Evidence 4 (v2) — supporting appendix

This appendix (sheet 6) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.

WorkstreamCross-refOperator review notes
Land & accessLA-6Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-6Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-6Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-6Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Ownership Evidence 4 (v2) · p.6

    The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.

  • [2] Ownership Evidence 4 (v2) · p.5

    Title extracts show unencumbered ownership subject only to standard utility easements.

  • [3] Ownership Evidence 4 (v2) · p.1

    OS-1 and OS-3 certificates are listed for the land interests described in the application schedules with registered proprietors aligned to Bernier LLC SPV Ltd.