GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0005

Reviewing documents for Port Gabriella Storage Scheme

Bundle references

0 / 0

Evidence Zero

TSO consultation requirement checked

Structured document preview (seed-rendered, same surface as the application report)

Assessment Summary

Pass against GC001 (grid_consultation).

Review Detail

Project must confirm whether TSO/NESO consultation is required based on capacity, voltage, transmission impact, and embedded generation rules.

Narrative Draft

This project passes tso consultation requirement checked. Pass against GC001 (grid_consultation).