TSO consultation requirement checked
Structured document preview (seed-rendered, same surface as the application report)
Assessment Summary
Pass against GC001 (grid_consultation).
Review Detail
Project must confirm whether TSO/NESO consultation is required based on capacity, voltage, transmission impact, and embedded generation rules.
Narrative Draft
This project passes tso consultation requirement checked. Pass against GC001 (grid_consultation).