Evidence Zero
Ownership Evidence 4 (v2)
Structured document preview (seed-rendered, same surface as the application report)
Ownership evidence pack — title and control summary
| Application reference | TAC-2026-0005 |
|---|---|
| Project | Port Gabriella Storage Scheme |
| Developer / client | Bernier LLC SPV Ltd |
| Parent developer | Legros, Howe and Rodriguez |
| Document (as filed) | Ownership Evidence 4 (v2) |
| Inferred type | ownership evidence |
| Category | land rights |
| Document date | 2026-06-07T11:23:08.000Z |
This pack summarises title and control evidence for the land associated with Port Gabriella Storage Scheme (TAC-2026-0005). It supports assertions that the project has sufficient rights over the development footprint and access routes.
| Parcel / title | Interest type | Notes |
|---|---|---|
| TITLE-A | Option / leasehold | Primary development footprint (80 acres). |
| TITLE-B | Easement route | Cable corridor and access rights. |
| TITLE-C | Wayleave | Temporary construction access and utility crossing. |
OS-1 and OS-3 certificates are listed for Haltom City Site: 550 Hardy Lake, Haleyshire with registered proprietors aligned to Bernier LLC SPV Ltd.
Solicitor commentary (extract)
Based on reviewed registers and plan extracts, no adverse entries materially preventing development have been identified, subject to standard assumptions and outstanding searches listed in the legal schedule.
Ownership Evidence 4 (v2) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 4 (v2) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 4 (v2) — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Title extracts show unencumbered ownership subject only to standard utility easements.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Ownership Evidence 4 (v2) — supporting appendix
This appendix (sheet 6) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-6 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-6 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-6 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-6 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Ownership Evidence 4 (v2) · p.6
The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.
[2] Ownership Evidence 4 · p.4
The bundle index references revision “R4” for one schedule but the attachment set only includes “R3”.
[3] Ownership Evidence 4 (v2) · p.5
Title extracts show unencumbered ownership subject only to standard utility easements.
[4] Ownership Evidence 4 (v2) · p.1
OS-1 and OS-3 certificates are listed for the land interests described in the application schedules with registered proprietors aligned to Bernier LLC SPV Ltd.