Outage window coordination evidenced
Structured document preview (seed-rendered, same surface as the application report)
Assessment Summary
Pass against GC005 (grid_consultation).
Review Detail
Project must identify outage requirements, network access windows, commissioning constraints, and operator coordination status.
Narrative Draft
This project passes outage window coordination evidenced. Pass against GC005 (grid_consultation).