Grid engineering lead assigned
Structured document preview (seed-rendered, same surface as the application report)
Assessment Summary
Risk identified against PE004 (personnel).
Review Detail
Project must name the accountable grid engineering lead responsible for connection data, technical submissions, studies, and operator engagement.
Narrative Draft
Rule PE004 is not satisfied for this submission. Risk identified against PE004 (personnel). Project must name the accountable grid engineering lead responsible for connection data, technical submissions, studies, and operator engagement. Link supporting documents so reviewers can anchor this outcome to source files.