Certificate of insurance — construction phase
| Application reference | TAC-2026-0005 |
|---|---|
| Project | Port Gabriella Storage Scheme |
| Developer / client | Bernier LLC SPV Ltd |
| Parent developer | Legros, Howe and Rodriguez |
| Document (as filed) | Insurance Certificate 1 (v2) |
| Inferred type | insurance certificate |
| Category | insurance |
| Document date | 2026-06-07T11:23:08.000Z |
This certificate evidences policies in force for works relating to Port Gabriella Storage Scheme (TAC-2026-0005) at Haltom City Site: 550 Hardy Lake, Haleyshire. Limits and deductibles are stated below and are subject to the full policy wordings.
| Insured | Bernier LLC SPV Ltd |
|---|---|
| Broker | Cairnholm Risk Partners Ltd |
| CAR policy no. | CAR-TAC20260-UK |
| Public liability limit | GBP 50,000,000 any one occurrence |
| Employers’ liability | GBP 10,000,000 any one claim |
Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.
CAR policy CAR-TAC20260-UK is listed for construction works at Haltom City Site: 550 Hardy Lake, Haleyshire.
Endorsements and loss payees
Loss payee endorsements shall be issued in favour of Meridian Project Finance Limited and any additional parties listed in the credit agreement. Delay in start-up cover is included subject to a waiting period of ninety (90) days.
The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.
Operational phase rollover
Upon PAC, operational all-risks and business interruption policies will roll in with a sum insured indexed to 35 MW (export) and declared technology (solar_pv).
Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.
Insurance Certificate 1 (v2) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Public liability is scheduled at £10,000,000 any one occurrence for Port Gabriella Storage Scheme construction and operations phases.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Insurance Certificate 1 (v2) — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Insurance Certificate 1 · p.2
Public liability is scheduled at £10,000,000 any one occurrence for Port Gabriella Storage Scheme construction and operations phases.
[2] Insurance Certificate 1 (v2) · p.3
Public liability is scheduled at £10,000,000 any one occurrence for Port Gabriella Storage Scheme construction and operations phases.
[3] Insurance Certificate 1 (v2) · p.2
Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.
[4] Insurance Certificate 1 (v2) · p.1
CAR policy CAR-TAC20260-UK is listed for construction works at the land interests described in the application schedules.
[5] Insurance Certificate 1 (v2) · p.2
The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.
[6] Insurance Certificate 1 (v2) · p.1
Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.