Correspondence 4 (v3)
Structured document preview (seed-rendered, same surface as the application report)
Project correspondence log and extracts
| Application reference | TAC-2026-0007 |
|---|---|
| Project | Cicero Wind Scheme |
| Developer / client | Bins - Kub SPV Ltd |
| Parent developer | Wiza Group |
| Document (as filed) | Correspondence 4 (v3) |
| Inferred type | correspondence |
| Category | correspondence |
| Document date | 2026-04-10T16:27:02.000Z |
This correspondence pack collates principal clarifications and responses for Cicero Wind Scheme (TAC-2026-0007) exchanged between the project team and reviewing parties in support of readiness assessment.
| Date | Ref | Summary |
|---|---|---|
| 2026-02-10 | COR-014 | Clarification on transformer procurement lead times and FAT witness windows. |
| 2026-02-17 | COR-018 | Updated red-line and access drawing cross-reference issued. |
| 2026-02-25 | COR-022 | Response to planning condition discharge query. |
Several email threads end with “we will revert” without a dated connection-offer status or modification reference.
Extracted correspondence themes
- Programme dependencies and long-lead procurement timing.
- Boundary, land rights, and title consistency checks.
- Technical assumptions used in network studies and protection submissions.
The correspondence log records clarifications exchanged with reviewing parties on transformer lead times, red-line drawings, and planning conditions.
Correspondence 4 (v3) — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
No outage requirements, network access windows, or commissioning access constraints are stated.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Correspondence 4 (v3) · p.2
The correspondence log records clarifications exchanged with reviewing parties on transformer lead times, red-line drawings, and planning conditions.
[2] Correspondence 4 (v3) · p.1
Several email threads end with “we will revert” without a dated connection-offer status or modification reference.
[3] Correspondence 4 (v3) · p.3
No outage requirements, network access windows, or commissioning access constraints are stated.