Evidence Zero
Single Line Diagram 6
Structured document preview (seed-rendered, same surface as the application report)
Single-line diagram — controlled schematic extract
| Application reference | TAC-2026-0007 |
|---|---|
| Project | Cicero Wind Scheme |
| Developer / client | Bins - Kub SPV Ltd |
| Parent developer | Wiza Group |
| Document (as filed) | Single Line Diagram 6 |
| Inferred type | single line diagram |
| Category | technical |
| Document date | 2026-05-06T17:42:12.000Z |
This controlled extract supports TAC-2026-0007 for Cicero Wind Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 30 MW (export). Technology: bess_export. Interface: West Ronaldoside Primary · 33 kV class interface.
| Drawing / doc no. | TAC-2026-0007-TEC-SLD-01 |
|---|---|
| Revision | C — issued for connection review |
| Author | Authorised technical representative |
This document states 33 kV, which must be compared against planning, offer, and contractual documents.
Key parameters (representative)
- POC at grid interface with main incomer, station transformer, and MV collection to inverter / PCS islands.
- Earthing: TN-S at POC transitioning to IT for selected MV sections per design review DR-TEC-14.
The schematic extract identifies the POC, transformer, MV collection, metering, and generation/storage assets at West Ronaldoside Primary · 33 kV class interface.
Single Line Diagram 6 — supporting appendix
This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-3 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-3 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-3 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-3 | Critical path through reinforcement, primary plant, and commissioning tests. |
Single Line Diagram 6 — supporting appendix
This appendix (sheet 4) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-4 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-4 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-4 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-4 | Critical path through reinforcement, primary plant, and commissioning tests. |
Single Line Diagram 6 — supporting appendix
This appendix (sheet 5) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.
| Workstream | Cross-ref | Operator review notes |
|---|---|---|
| Land & access | LA-5 | Verify red-line, access rights, and any wayleave assumptions against latest survey. |
| Planning & consent | PC-5 | Confirm commencement conditions and discharge of pre-commencement items. |
| Electrical design | EL-5 | Align SLD, protection, and fault level study with latest DNO / TO model version. |
| Programme | PR-5 | Critical path through reinforcement, primary plant, and commissioning tests. |
Cited Extracts
[1] Single Line Diagram 6 · p.1
Connection at 33 kV bus to local DNO substation.
[2] Single Line Diagram 6 · p.1
This document states 33 kV, which must be compared against planning, offer, and contractual documents.
[3] Single Line Diagram 6 · p.3
Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.
[4] Single Line Diagram 6 · p.2