GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0007

Reviewing documents for Cicero Wind Scheme

Bundle references

1 / 1

Evidence Zero

Export Capacity Schedule 1

Structured document preview (seed-rendered, same surface as the application report)

Export capacity schedule — operating envelopes

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Export Capacity Schedule 1
Inferred typeexport capacity schedule
Categorytechnical
Document date2026-05-06T17:42:12.000Z

This controlled extract supports TAC-2026-0007 for Cicero Wind Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 30 MW (export). Technology: bess_export. Interface: West Ronaldoside Primary · 33 kV class interface.

Drawing / doc no.TAC-2026-0007-TEC-EXPORT-01
RevisionC — issued for connection review
AuthorAuthorised technical representative

Declared export capability is 30 MW (export) and is stated net of auxiliary load.

Key parameters (representative)

- Firm export capability stated net of auxiliary load; curtailment assumptions per annual yield model v4.

- Ramp rate limits under grid code ride-through tables attached to the full submission.

Export Capacity Schedule 1 — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Export Capacity Schedule 1 — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Export Capacity Schedule 1 — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Export Capacity Schedule 1 — supporting appendix

This appendix (sheet 6) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-6Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-6Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-6Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-6Critical path through reinforcement, primary plant, and commissioning tests.

Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.

Export Capacity Schedule 1 — supporting appendix

This appendix (sheet 7) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-7Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-7Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-7Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-7Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Export Capacity Schedule 1 · p.1

    Declared maximum export capacity: 30 MW (steady state).

  • [2] Export Capacity Schedule 1 · p.2

    Installed plant capacity: 51 MW (sum of generators).

  • [3] Export Capacity Schedule 1 · p.1

    Declared export capability is 30 MW (export) and is stated net of auxiliary load.

  • [4] Export Capacity Schedule 1 · p.6

    Harmonic limits are referenced as “per grid code” without attaching the underlying study identifier.

  • [5] Export Capacity Schedule 1 · p.5

    The schedule references curtailment assumptions but provides no ANM control obligations, caps, or dispatch interface.