GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0007

Reviewing documents for Cicero Wind Scheme

Bundle references

1 / 14

Evidence Zero

Planning Decision Notice 1 (v4)

Structured document preview (seed-rendered, same surface as the application report)

Decision notice — grant of planning permission

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Planning Decision Notice 1 (v4)
Inferred typeplanning decision notice
Categoryplanning
Document date2026-05-06T17:42:12.000Z

Local planning authority reference: PA/0007-2026. Permission is granted to Bins - Kub SPV Ltd for development comprising bess_export and associated infrastructure at Macyfield Site: 365 Bogan Mountains, Lake Gustaveton, in accordance with the plans listed in the schedule to the application.

Conditions

1. Construction hours: Monday–Friday 07:00–19:00, Saturday 08:00–13:00, excluding public holidays unless otherwise approved.

2. Ecology: habitat compensation areas to be established in accordance with the approved landscape and ecology management plan.

3. Noise: operational noise limits at nearest noise-sensitive receptors as set out in the environmental statement chapter 11.

Reasons for decision (summary)

The authority weighed landscape and visual effects, heritage assets, highway safety, and flood risk. Mitigation secured by condition addresses the main adverse effects to an acceptable degree. The development is consistent with development plan policies on renewable energy subject to compliance with conditions.

The proposal aligns with the declared export capacity (30 MW (export)) and the connection location described as West Ronaldoside Primary · 33 kV class interface for grid-related externalities assessed in the ES.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The notice uses local planning language, while the connection context references 33 kV and West Ronaldoside Primary · 33 kV class interface.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 6) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-6Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-6Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-6Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-6Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 7) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-7Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-7Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-7Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-7Critical path through reinforcement, primary plant, and commissioning tests.

Conditions are listed, but no owner, due date, discharge status, or delivery governance reference is provided.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 8) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-8Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-8Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-8Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-8Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 9) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-9Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-9Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-9Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-9Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 10) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-10Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-10Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-10Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-10Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 11) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-11Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-11Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-11Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-11Critical path through reinforcement, primary plant, and commissioning tests.

Planning Decision Notice 1 (v4) — supporting appendix

This appendix (sheet 12) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Permission is granted to Bins - Kub SPV Ltd for bess_export at Macyfield Site: 365 Bogan Mountains, Lake Gustaveton.

WorkstreamCross-refOperator review notes
Land & accessLA-12Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-12Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-12Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-12Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Planning Decision Notice 1 (v3) · p.1

    Permission shall expire on 2030-12-30 unless development is commenced.

  • [2] Planning Decision Notice 1 (v3) · p.1

    The Council hereby GRANTS planning permission subject to conditions.

  • [3] Planning Decision Notice 1 (v4) · p.12

    Permission is granted to Bins - Kub SPV Ltd for bess_export at the land interests described in the application schedules.

  • [4] Planning Decision Notice 1 (v4) · p.4

    The notice uses local planning language, while the connection context references 33 kV and West Ronaldoside Primary · 33 kV class interface.

  • [5] Planning Decision Notice 1 (v4) · p.7

    Conditions are listed, but no owner, due date, discharge status, or delivery governance reference is provided.