Certificate of insurance — construction phase

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Insurance Certificate 1 (v2)
Inferred typeinsurance certificate
Categoryinsurance
Document date2026-05-06T17:42:12.000Z

This certificate evidences policies in force for works relating to Cicero Wind Scheme (TAC-2026-0007) at Macyfield Site: 365 Bogan Mountains, Lake Gustaveton. Limits and deductibles are stated below and are subject to the full policy wordings.

InsuredBins - Kub SPV Ltd
BrokerCairnholm Risk Partners Ltd
CAR policy no.CAR-TAC20260-UK
Public liability limitGBP 50,000,000 any one occurrence
Employers’ liabilityGBP 10,000,000 any one claim

Endorsements and loss payees

Loss payee endorsements shall be issued in favour of Meridian Project Finance Limited and any additional parties listed in the credit agreement. Delay in start-up cover is included subject to a waiting period of ninety (90) days.

Operational phase rollover

Upon PAC, operational all-risks and business interruption policies will roll in with a sum insured indexed to 30 MW (export) and declared technology (bess_export).

Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.

Insurance Certificate 1 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Insurance Certificate 1 (v2) — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

CAR policy CAR-TAC20260-UK is listed for construction works at Macyfield Site: 365 Bogan Mountains, Lake Gustaveton.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.

Insurance Certificate 1 (v2) — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Public liability is scheduled at £10,000,000 any one occurrence for Cicero Wind Scheme construction and operations phases.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Insurance Certificate 1 (v2) · p.2

    Deductibles and waiting periods are listed, but the certificate does not show whether they are carried through the financial downside case.

  • [2] Insurance Certificate 1 (v2) · p.5

    Public liability is scheduled at £10,000,000 any one occurrence for Cicero Wind Scheme construction and operations phases.

  • [3] Insurance Certificate 1 (v2) · p.4

    Upstream and downstream liabilities are referenced with aggregate limits and a schedule of principal endorsements.

  • [4] Insurance Certificate 1 (v2) · p.4

    CAR policy CAR-TAC20260-UK is listed for construction works at the land interests described in the application schedules.

  • [5] Insurance Certificate 1 (v2) · p.3

    The policy expiry date is 2026-06-15, before planned construction start on 2026-07-01, and no renewal undertaking is attached.