GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0007

Reviewing documents for Cicero Wind Scheme

Bundle references

1 / 5

Evidence Zero

Correspondence 2

Structured document preview (seed-rendered, same surface as the application report)

Project correspondence log and extracts

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Correspondence 2
Inferred typecorrespondence
Categorycorrespondence
Document date2026-05-06T17:42:12.000Z

This correspondence pack collates principal clarifications and responses for Cicero Wind Scheme (TAC-2026-0007) exchanged between the project team and reviewing parties in support of readiness assessment.

The correspondence log records clarifications exchanged with reviewing parties on transformer lead times, red-line drawings, and planning conditions.

DateRefSummary
2026-02-10COR-014Clarification on transformer procurement lead times and FAT witness windows.
2026-02-17COR-018Updated red-line and access drawing cross-reference issued.
2026-02-25COR-022Response to planning condition discharge query.

Several email threads end with “we will revert” without a dated connection-offer status or modification reference.

No outage requirements, network access windows, or commissioning access constraints are stated.

Extracted correspondence themes

- Programme dependencies and long-lead procurement timing.

- Boundary, land rights, and title consistency checks.

- Technical assumptions used in network studies and protection submissions.

Cited Extracts

  • [1] Correspondence 2 · p.1

    No outage requirements, network access windows, or commissioning access constraints are stated.

  • [2] Correspondence 2 · p.1

    The correspondence log records clarifications exchanged with reviewing parties on transformer lead times, red-line drawings, and planning conditions.

  • [3] Correspondence 2 · p.1

    Several email threads end with “we will revert” without a dated connection-offer status or modification reference.