GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0007

Reviewing documents for Cicero Wind Scheme

Bundle references

1 / 7

Evidence Zero

Single Line Diagram 6

Structured document preview (seed-rendered, same surface as the application report)

Single-line diagram — controlled schematic extract

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Single Line Diagram 6
Inferred typesingle line diagram
Categorytechnical
Document date2026-05-06T17:42:12.000Z

This controlled extract supports TAC-2026-0007 for Cicero Wind Scheme. It must be read with the latest connection offer assumptions, fault level study, and earthing design. Declared export capability: 30 MW (export). Technology: bess_export. Interface: West Ronaldoside Primary · 33 kV class interface.

Drawing / doc no.TAC-2026-0007-TEC-SLD-01
RevisionC — issued for connection review
AuthorAuthorised technical representative

This document states 33 kV, which must be compared against planning, offer, and contractual documents.

Key parameters (representative)

- POC at grid interface with main incomer, station transformer, and MV collection to inverter / PCS islands.

- Earthing: TN-S at POC transitioning to IT for selected MV sections per design review DR-TEC-14.

The schematic extract identifies the POC, transformer, MV collection, metering, and generation/storage assets at West Ronaldoside Primary · 33 kV class interface.

Single Line Diagram 6 — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Single Line Diagram 6 — supporting appendix

This appendix (sheet 4) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-4Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-4Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-4Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-4Critical path through reinforcement, primary plant, and commissioning tests.

Single Line Diagram 6 — supporting appendix

This appendix (sheet 5) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-5Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-5Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-5Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-5Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Single Line Diagram 6 · p.1

    Proposed POC: 33 kV busbar, DNO primary substation.

  • [2] Single Line Diagram 6 · p.1

    Connection at 33 kV bus to local DNO substation.

  • [3] Single Line Diagram 6 · p.1

    This document states 33 kV, which must be compared against planning, offer, and contractual documents.

  • [4] Single Line Diagram 6 · p.3

    Auxiliary, charging, commissioning, and operational import capacity are not stated anywhere in the extract.

  • [5] Single Line Diagram 6 · p.2

    The schematic extract identifies the POC, transformer, MV collection, metering, and generation/storage assets at West Ronaldoside Primary · 33 kV class interface.