GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0005

Reviewing documents for Port Gabriella Storage Scheme

Bundle references

1 / 2

Evidence Zero

Letter of Authority 1 (v2)

Structured document preview (seed-rendered, same surface as the application report)

Letter of authority

Application referenceTAC-2026-0005
ProjectPort Gabriella Storage Scheme
Developer / clientBernier LLC SPV Ltd
Parent developerLegros, Howe and Rodriguez
Document (as filed)Letter of Authority 1 (v2)
Inferred typeletter of authority
Categorycorporate authority
Document date2026-06-07T11:23:08.000Z

Bernier LLC SPV Ltd hereby appoints the authorised representatives listed below to act on its behalf in relation to Port Gabriella Storage Scheme (TAC-2026-0005), including correspondence with the network operator and associated stakeholders concerning the proposed connection at Wolftown BSP · 66 kV class interface.

No sanctions, AML, beneficial-owner, or counterparty screening result is attached or referenced.

RepresentativeRoleAuthority scope
Programme DirectorProject leadSubmit and receive technical/commercial correspondence.
Grid Connections ManagerTechnical leadIssue clarifications and coordinate study responses.
Legal CounselAuthorised signatoryExecute ancillary connection-related documentation.

Limitations and duration

This authority remains in force until revoked in writing by the principal, and does not permit amendment of shareholder obligations, financing commitments, or land rights instruments without separate board approval.

Reliance

Recipients may rely on this letter as evidence of authority for operational correspondence and data exchange relevant to the connection application process.

Signed for and on behalf of the Principal

Named representatives are authorised to act for Bernier LLC SPV Ltd on connection correspondence and related documentation.

Name: ___________________________

Title: ___________________________

The signatory list matches the register, but monetary delegation thresholds are not reproduced here.

Date: ____________________________

Letter of Authority 1 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0005 for Port Gabriella Storage Scheme. It cross-references the declared export capability (35 MW (export)), the technology mix (solar_pv), and the connection scope at Wolftown BSP · 66 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Letter of Authority 1 (v2) · p.2

    Named representatives are authorised to act for Bernier LLC SPV Ltd on connection correspondence and related documentation.

  • [2] Letter of Authority 1 (v2) · p.2

    The signatory list matches the register, but monetary delegation thresholds are not reproduced here.

  • [3] Letter of Authority 1 (v2) · p.1

    No sanctions, AML, beneficial-owner, or counterparty screening result is attached or referenced.