GridLayer Operator View
UK DNO 1

Rules & Policy Packs

Active criteria for the current Gate 2 tranche, grouped by policy domain. Use the arrow control to expand or collapse each domain. Page through criteria with the controls under the domain title.

13 domains101 criteria

Active criteria by domain

Loaded from rule_packs collection

Readiness

4 criteriona
CriterionAuthority
Blocking items resolved
RD001 · readiness.blocking_items_resolved
TAC Rule Engine
Operator - Rule-pack aggregation policy
Domain scores above threshold
RD002 · readiness.domain_scores_above_threshold
TAC Rule Engine
Operator - Domain readiness scoring policy
Evidence freshness checked
RD003 · readiness.evidence_freshness_checked
TAC Rule Engine
Operator - Evidence freshness policy
Overall readiness verdict
RD004 · readiness.overall
TAC Rule Engine
Operator - Rule-pack aggregation policy

Grid & connection

10 criteriona
CriterionAuthority
Connection voltage declared and consistent
CN001 · connection.voltage_declared_consistent
Distribution Network Operator
Operator - Connection application technical data requirements
Export capacity within scheme limits
CN002 · connection.export_capacity_within_limits
NESO
National - Connection capacity assessment rules
Import capacity declared
CN003 · connection.import_capacity_declared
Distribution Network Operator
Operator - Connection application import data requirements
Single-line diagram provided
CN004 · connection.single_line_diagram_provided
Distribution Network Operator
Operator - Technical submission diagram requirements
Protection settings available
CN005 · connection.protection_settings_available
Distribution Network Operator
Operator - Protection coordination requirements
Fault level assessment complete
CN006 · connection.fault_level_assessment_complete
Distribution Network Operator
Operator - Fault level assessment requirements
Power quality assessment complete
CN007 · connection.power_quality_assessment_complete
Distribution Network Operator
Operator - Power quality compliance requirements
Active network management terms declared
CN008 · connection.active_network_management_terms_declared
Distribution Network Operator
Operator - Flexible connection and ANM policy
Metering scheme defined
CN009 · connection.metering_scheme_defined
Distribution Network Operator
Operator - Metering and settlement requirements
SCADA and communications design defined
CN010 · connection.scada_communications_defined
Distribution Network Operator
Operator - SCADA and telemetry interface requirements

Planning

7 criteriona
CriterionAuthority
Planning consent granted or path defined
PL001 · planning.consent_granted_or_path_defined
NSIP / Local Planning Authority
Local - Planning determination process
Correct permission route selected
PL002 · planning.permission_route_correct
Planning Inspectorate / Local Planning Authority
National - Planning route selection guidance
Planning conditions are trackable
PL003 · planning.conditions_trackable
Local Planning Authority
Local - Condition discharge requirements
Community consultation report provided
PL004 · planning.community_consultation_report
Local Planning Authority
Local - Statement of community involvement
Statement of need provided
PL005 · planning.statement_of_need_provided
Planning Inspectorate / Local Planning Authority
National - Planning statement requirements
Design and access statement provided
PL006 · planning.design_and_access_statement
Local Planning Authority
Local - Design and access statement validation
Green belt assessment provided
PL007 · planning.green_belt_assessment
Local Planning Authority
Local - Green belt impact assessment

Land & environment

24 criteriona

Showing 118 of 24

Page 1 / 2
CriterionAuthority
Land ownership, lease, or option evidenced
LE001 · land.ownership_or_option_evidenced
Project Owner Legal Authority
Operator - Land control evidence policy
Land agreement valid through construction start
LE002 · land.agreement_valid_through_construction_start
Project Owner Legal Authority
Operator - Land agreement validity policy
Right-of-way plan provided
LE003 · land.right_of_way_plan_provided
Project Owner Legal Authority
Operator - Access and wayleave readiness checklist
Land plan boundary consistent
LE004 · land.land_plan_boundary_consistent
Local Planning Authority
Local - Planning validation land plan requirements
Third-party rights identified
LE005 · land.third_party_rights_identified
Project Owner Legal Authority
Operator - Title due diligence checklist
Reinstatement and decommissioning plan provided
LE006 · land.reinstatement_and_decommissioning_plan
Local Planning Authority
Local - Decommissioning and restoration requirements
Landscape and visual impact assessment provided
LE007 · environment.landscape_visual_impact_assessment
Local Planning Authority
Local - Landscape and visual impact assessment
Historic environment assessment provided
LE008 · environment.historic_environment_assessment
Historic England / Local Planning Authority
National - Heritage impact assessment
Ecology and nature assessment provided
LE009 · environment.ecology_and_nature_assessment
Natural England
National - Ecological impact assessment requirements
Protected species plan provided
LE010 · environment.protected_species_plan
Natural England
National - Protected species licensing and mitigation guidance
Biodiversity net gain assessment provided
LE011 · environment.biodiversity_net_gain_assessment
Local Planning Authority
Local - Biodiversity net gain validation requirements
Habitat management plan provided
LE012 · environment.habitat_management_plan
Local Planning Authority
Local - Habitat management and monitoring plan
Water body and river basin management plan checked
LE013 · environment.water_body_river_basin_plan
Environment Agency
Regional - Water environment and river basin management requirements
Flood risk assessment provided
LE014 · environment.flood_risk_assessment
Environment Agency
Regional - Flood risk standing advice
Hydraulic modelling completed where required
LE015 · environment.hydraulic_modelling_completed
Environment Agency
Regional - Hydrology and hydraulic modelling guidance
Soil analysis completed
LE016 · environment.soil_analysis_completed
Local Planning Authority
Local - Soils and agricultural land assessment
Hedgerow removal plan provided
LE017 · environment.hedgerow_removal_plan
Local Planning Authority
Local - Hedgerow and arboricultural validation requirements
Arboricultural impact assessment provided
LE018 · environment.arboricultural_impact_assessment
Local Planning Authority
Local - Arboricultural impact assessment requirements

Financing

8 criteriona
CriterionAuthority
Funding statement provided
FI001 · financing.funding_statement_provided
Project Finance Lender
Operator - Project funding statement requirement
Sources and uses balance
FI002 · financing.sources_and_uses_balanced
Project Finance Lender
Operator - Sources and uses validation
Grid connection costs included
FI003 · financing.grid_connection_costs_included
Project Finance Lender
Operator - Grid cost financial model requirements
Construction contingency above threshold
FI004 · financing.contingency_above_threshold
Project Finance Lender
Operator - Construction budget contingency policy
Lender due diligence status declared
FI005 · financing.lender_due_diligence_status_declared
Project Finance Lender
Operator - Lender due diligence tracker
Revenue assumptions supported
FI006 · financing.revenue_assumptions_supported
Project Finance Lender
Operator - Revenue case evidence policy
AML checks complete
FI007 · financing.anti_money_laundering_checks_complete
Project Owner Compliance Authority
Operator - AML and sanctions screening policy
Anti-corruption declaration provided
FI008 · financing.anti_corruption_declaration_provided
Project Owner Compliance Authority
Operator - Anti-bribery and corruption policy

Insurance

6 criteriona
CriterionAuthority
Insurance capacity cover in force
IN001 · insurance.capacity_cover_in_force
NESO
National - Connection application insurance schedule
Insurance covers upstream/downstream consequences
IN002 · insurance.upstream_downstream_liability
NESO
National - Grid impact liability requirements
Construction all-risks policy active
IN003 · insurance.construction_all_risks_active
Project Owner Insurance Authority
Operator - Construction insurance readiness policy
Professional indemnity cover for key consultants
IN004 · insurance.professional_indemnity_consultants
Project Owner Legal Authority
Operator - Consultant appointment governance
Policy expiry extends beyond construction start
IN005 · insurance.policy_expiry_after_construction_start
Project Owner Insurance Authority
Operator - Notice to proceed insurance checklist
Insurance deductibles reflected in financial model
IN006 · insurance.deductibles_within_financial_model
Project Finance Lender
Operator - Financial model insurance assumptions

Construction & deliverability

7 criteriona
CriterionAuthority
Construction method statement provided
CO001 · construction.method_statement_provided
Principal Contractor
Operator - Construction phase plan
Safe materials confirmed
CO002 · construction.safe_materials_confirmed
Principal Designer
Operator - Material safety and technical submittals
Construction programme aligned to grid milestones
CO003 · construction.programme_aligned_to_grid_milestones
Distribution Network Operator
Operator - Connection milestone coordination
Traffic management plan provided
CO004 · construction.traffic_management_plan
Local Highway Authority
Local - Construction traffic management requirements
Construction environmental management plan provided
CO005 · construction.environmental_management_plan
Local Planning Authority
Local - Construction environmental management plan
Fire safety plan provided
CO006 · construction.fire_safety_plan
Fire and Rescue Authority
Local - Fire safety consultation guidance
Commissioning plan provided
CO007 · construction.commissioning_plan_provided
Distribution Network Operator
Operator - Commissioning and energisation procedure

Procurement

9 criteriona
CriterionAuthority
Supplier is a valid trading company
PR001 · procurement.supplier_valid_company
Project Owner Procurement Authority
Operator - Supplier onboarding policy
Supplier liquidity checked
PR002 · procurement.supplier_liquidity_checked
Project Owner Procurement Authority
Operator - Supplier financial health policy
Procurement agreement valid through construction start
PR003 · procurement.agreement_valid_through_construction_start
Project Owner Procurement Authority
Operator - Procurement validity policy
Long-lead items identified
PR004 · procurement.long_lead_items_identified
Project Owner Procurement Authority
Operator - Long-lead item procurement checklist
Procurement spec declares grid-forming capability
PR005 · procurement.grid_forming_capability_declared
NESO
National - Stability and system services readiness guidance
Grid-following risk treatment disclosed
PR006 · procurement.grid_following_risk_disclosed
Project Owner Engineering Authority
Operator - Internal technology risk policy
Expansion capacity reserved where required
PR007 · procurement.expansion_capacity_reserved
Project Owner Engineering Authority
Operator - Future expansion design policy
Warranty and performance guarantees provided
PR008 · procurement.warranty_and_performance_guarantees
Project Owner Procurement Authority
Operator - Equipment warranty policy
Cyber security requirements included
PR009 · procurement.cyber_security_requirements_included
Project Owner Cyber Security Authority
Operator - Operational technology cyber policy

Personnel

6 criteriona
CriterionAuthority
Developer experience evidenced
PE001 · personnel.developer_experience_evidenced
Project Finance Lender
Operator - Sponsor experience due diligence
EPC contractor qualified
PE002 · personnel.epc_contractor_qualified
Project Owner Procurement Authority
Operator - EPC qualification policy
Principal designer and contractor named
PE003 · personnel.principal_designer_and_contractor_named
Health and Safety Executive
National - CDM duty holder readiness
Grid engineering lead assigned
PE004 · personnel.grid_engineering_lead_assigned
Project Owner Engineering Authority
Operator - Grid engineering governance
Environmental consultant appointed
PE005 · personnel.environmental_consultant_appointed
Local Planning Authority
Local - Environmental submission competency
Responsibility matrix complete
PE006 · personnel.responsibility_matrix_complete
Project Owner Delivery Authority
Operator - Project governance requirements

Grid consultation

5 criteriona
CriterionAuthority
TSO consultation requirement checked
GC001 · grid_consultation.tso_consultation_required_checked
NESO
National - Transmission impact assessment process
DNO pre-application engagement completed
GC002 · grid_consultation.dno_pre_application_completed
Distribution Network Operator
Operator - Connection pre-application process
Connection offer status declared
GC003 · grid_consultation.connection_offer_status_declared
Distribution Network Operator
Operator - Connection offer status requirements
Statement of Works status declared
GC004 · grid_consultation.statement_of_works_status_declared
NESO
National - Statement of Works process
Outage window coordination evidenced
GC005 · grid_consultation.outage_window_coordination
Distribution Network Operator
Operator - Outage planning coordination
5 criteriona
CriterionAuthority
Company authority to contract confirmed
LC001 · legal.company_authority_to_contract
Project Owner Legal Authority
Operator - Corporate authority checklist
Permits register complete
LC002 · legal.permits_register_complete
Project Owner Legal Authority
Operator - Permits and consents register
Material contracts signed or statused
LC003 · legal.material_contracts_signed_or_statused
Project Owner Legal Authority
Operator - Material contracts readiness checklist
Sanctions screening complete
LC004 · legal.sanctions_screening_complete
Project Owner Compliance Authority
Operator - Sanctions screening policy
Data room index complete
LC005 · legal.data_room_index_complete
Project Owner Delivery Authority
Operator - Data room governance policy

Health & safety

5 criteriona
CriterionAuthority
Hazard identification complete
SA001 · safety.hazard_identification_complete
Health and Safety Executive
National - Project safety risk assessment
Electrical safety rules defined
SA002 · safety.electrical_safety_rules_defined
Project Owner Safety Authority
Operator - Electrical safety rules
Emergency response plan provided
SA003 · safety.emergency_response_plan
Fire and Rescue Authority
Local - Emergency response coordination
Site security plan provided
SA004 · safety.site_security_plan
Project Owner Security Authority
Operator - Site security requirements
Safety zone assessment provided
SA005 · safety.safety_zone_assessment
Local Planning Authority
Local - Safety zone and separation assessment

Operations

5 criteriona
CriterionAuthority
O&M provider identified
OP001 · operations.om_provider_identified
Project Owner Operations Authority
Operator - O&M readiness checklist
Availability assumptions supported
OP002 · operations.availability_assumptions_supported
Project Finance Lender
Operator - Operational availability due diligence
Spare parts strategy provided
OP003 · operations.spare_parts_strategy
Project Owner Operations Authority
Operator - Critical spares policy
Monitoring and reporting defined
OP004 · operations.monitoring_and_reporting_defined
Project Owner Operations Authority
Operator - Operational reporting requirements
Decommissioning responsibility assigned
OP005 · operations.decommissioning_responsibility_assigned
Local Planning Authority
Local - Decommissioning condition requirements