GridLayer Operator View
UK DNO 1

Document Review

Review application documents and agent-cited evidence. TAC-2026-0007

Reviewing documents for Cicero Wind Scheme

Bundle references

1 / 3

Evidence Zero

Company Authorisation 1 (v2)

Structured document preview (seed-rendered, same surface as the application report)

Board authorisation and delegated authority extract

Application referenceTAC-2026-0007
ProjectCicero Wind Scheme
Developer / clientBins - Kub SPV Ltd
Parent developerWiza Group
Document (as filed)Company Authorisation 1 (v2)
Inferred typecompany authorisation
Categorycorporate authority
Document date2026-05-06T17:42:12.000Z

Extract from minutes/resolutions of Bins - Kub SPV Ltd confirming authority to progress Cicero Wind Scheme (TAC-2026-0007), including execution of connection documentation, appointment of advisers, and issuance of project correspondence.

Named representatives are authorised to act for Bins - Kub SPV Ltd on connection correspondence and related documentation.

Board resolutions

1. Resolved that the project be progressed in accordance with approved budget and governance limits.

2. Resolved that named officers may execute and deliver connection and development documents within delegated authority thresholds.

3. Resolved that financing, insurance, and EPC negotiations proceed subject to final board approval points.

Delegation matrix (extract)

FunctionDelegated toLimit / condition
Connection correspondenceGrid Connections ManagerOperational responses and data exchange only.
Contract executionDirector-level signatoryDual-signature required above delegated threshold.
Adviser appointmentProject DirectorWithin approved annual budget envelope.

The signatory list matches the register, but monetary delegation thresholds are not reproduced here.

Company Authorisation 1 (v2) — supporting appendix

This appendix (sheet 3) supplements TAC-2026-0007 for Cicero Wind Scheme. It cross-references the declared export capability (30 MW (export)), the technology mix (bess_export), and the connection scope at West Ronaldoside Primary · 33 kV class interface. Figures in the operator-facing pack may supersede this extract where stamped “controlled copy”.

No sanctions, AML, beneficial-owner, or counterparty screening result is attached or referenced.

WorkstreamCross-refOperator review notes
Land & accessLA-3Verify red-line, access rights, and any wayleave assumptions against latest survey.
Planning & consentPC-3Confirm commencement conditions and discharge of pre-commencement items.
Electrical designEL-3Align SLD, protection, and fault level study with latest DNO / TO model version.
ProgrammePR-3Critical path through reinforcement, primary plant, and commissioning tests.

Cited Extracts

  • [1] Company Authorisation 1 (v2) · p.1

    Named representatives are authorised to act for Bins - Kub SPV Ltd on connection correspondence and related documentation.

  • [2] Company Authorisation 1 (v2) · p.2

    The signatory list matches the register, but monetary delegation thresholds are not reproduced here.

  • [3] Company Authorisation 1 (v2) · p.3

    No sanctions, AML, beneficial-owner, or counterparty screening result is attached or referenced.